test(canvas): close requirement matrix and preserve interleaved import history

This commit is contained in:
2026-11-11 19:26:12 +08:00
parent d3eef78431
commit 14f7475296
6 changed files with 130 additions and 9 deletions
+12 -7
View File
@@ -1,8 +1,9 @@
# Foundry service integration evidence
Status: steps 5 (service) and 6 (migration/delivery) completed; overall progress is 6/7.
The complete Draft acceptance matrix, main integration and production deployment
are not complete.
The T01–T36 source/assertion audit and current frontend regression gates have
passed; see [FINAL_ACCEPTANCE.md](FINAL_ACCEPTANCE.md). Main integration and
production deployment are separate, pending steps.
## Verified revisions and environment
@@ -28,7 +29,7 @@ are not complete.
- Existing `ces-control` runner executes Go checks/build, schema migration and
isolated PostgreSQL integration, then the pinned Node 24 consumer and HTTP smoke
checks. No local backend build or Docker execution was used.
- Local frontend: 821 Node tests and full TypeScript checking passed. Tests use
- Local frontend: 822 Node tests and full TypeScript checking passed. Tests use
the source modules; packaged SDK and application delivery remain separate gates.
## What the checks actually prove
@@ -109,7 +110,10 @@ the full Node suite passes 821. `resources.test.mjs` also verifies replacement o
an existing image while the new upload is gated: the old server reference stays
valid, undo prevents a late replacement, and redo/reopen reuse the two uploaded
resources without a new upload or element incarnation. Its 32 checks pass.
The final acceptance matrix is still in progress.
The subsequent T01–T36 audit is recorded in `FINAL_ACCEPTANCE.md`; the final
frontend run passes 822 Node tests, with both 51-check browser bundlers, 10 hooks,
57 browser-storage checks, 6 proxy checks, both five-scenario migration entries
and the 270-file unpacked package passing.
## Boundaries and remaining audit
@@ -140,7 +144,7 @@ there is no pending migration. The stage 6 audit also inspected source/package
exports, peer dependencies and documentation targets, then passed the actual
267-file unpacked package's Node/types, framework-peer, compiled browser storage
and Worker checks. Together with CI #1182 and both browser bundlers this closes
stage 6. The full requirement matrix remains stage 7; the two new scheduler
stage 6. The final requirement matrix is recorded separately; the two new scheduler
clock-shift checks cover backward/forward wall time, dependency/unknown claims,
stale timer callbacks and remaining wait calculation after recovery.
@@ -160,6 +164,7 @@ The service audit covers the original stage requirements: target incremental and
idempotent protocols, frontend/runtime/resource adapters, explicit legacy
compatibility, identity mapping, source-version/permission/run admission barriers,
and rollback after writes have begun. Migration/delivery now has the separate
browser/package evidence above; the final requirement matrix remains. A green
browser/package evidence above; the final requirement matrix now has its separate per-row audit. A green
feature-branch run does not merge or deploy
either repository. Foundry PR #19 remains open and Draft.
either repository. Foundry PR #19 remains open; readiness is updated after final delivery checks,
and merging requires the user’s manual action.